Wastewater Master Plan (2021)

Post

The 2021 Wastewater Master Plan evaluates the operation and capacity of the existing wastewater collection system and wastewater treatment plant within the City of Redlands and makes recommendations for future system improvement.

Wastewater Master Plan addresses the following key objectives:

  • Develop a new collection system hydraulic model based on current flow and wastewater facilities data and confirm existing and future dry and wet weather capacity
  • Perform a high-level capacity analysis and process evaluation on the City’s wastewater treatment plant.
  • Develop project costs and prioritize recommended capital improvement projects.

Wastewater Master Plan: click here